Latest Program :

Peck drilling cycle (G83, G87)

Peck drilling cycle (G83, G87):-


Format:-
G83 X(U)_ C(H)_ Z(W)_ R_ Q_ P_ F_ K_ M_ ;
or
G87 Z(W)_ C(H)_ X(U)_ R_ Q_ P_ F_ K_ M_ ;


X_ C_ or Z_ C_  :  Hole position data
Z_ or X_   :  The distance from point R to the bottom of the hole
R_  :  The distance from the initial level to point R level
Q_  :  Depth of cut for each cutting feed
P_  :  Dwell time at the bottom of a hole
F_  :  Cutting feedrate
K_  :  Number of repeats (When it is needed.)
M_  :  M code for C–axis clamp (When it is needed.)


Examples:-
       M51  ;                Setting C–axis index mode ON
       M3 S2000 ;         Rotating the drill
      G00 X50.0 C0.0 ; Positioning the drill along the X– and C–axes
      G83 Z–40.0 R–5.0 Q5000 F5.0 M31 ; Drilling hole 1
      C90.0 M31 ;                Drilling hole 2
      C180.0 M31 ;      Drilling hole 3
      C270.0 M31 ;      Drilling hole 4
      G80 M05 ;   Canceling the drilling cycle and stopping drill rotation
      M50 ;                  Setting C–axis index mode off




Notes:-
                   If the depth of cut for each cutting feed (Q) is not commanded, normal drilling is performed.(see the description of the drilling cycle.)
Share this article :

+ comments + 1 comments

August 14, 2018 at 8:56 AM

nice artical on drilling
Fanuc G73 high speed peck drilling cycle program

Post a Comment

 
Support : Creating Website | Johny Template | Mas Template
Copyright © 2011. Online Education - All Rights Reserved
Template Created by Creating Website Published by Mas Template
Proudly powered by Blogger