Latest Program :
Recent Program
Showing posts with label Peck Drilling Cycle. Show all posts
Showing posts with label Peck Drilling Cycle. Show all posts

Peck drilling cycle (G83, G87)

Peck drilling cycle (G83, G87):-


Format:-
G83 X(U)_ C(H)_ Z(W)_ R_ Q_ P_ F_ K_ M_ ;
or
G87 Z(W)_ C(H)_ X(U)_ R_ Q_ P_ F_ K_ M_ ;


X_ C_ or Z_ C_  :  Hole position data
Z_ or X_   :  The distance from point R to the bottom of the hole
R_  :  The distance from the initial level to point R level
Q_  :  Depth of cut for each cutting feed
P_  :  Dwell time at the bottom of a hole
F_  :  Cutting feedrate
K_  :  Number of repeats (When it is needed.)
M_  :  M code for C–axis clamp (When it is needed.)


Examples:-
       M51  ;                Setting C–axis index mode ON
       M3 S2000 ;         Rotating the drill
      G00 X50.0 C0.0 ; Positioning the drill along the X– and C–axes
      G83 Z–40.0 R–5.0 Q5000 F5.0 M31 ; Drilling hole 1
      C90.0 M31 ;                Drilling hole 2
      C180.0 M31 ;      Drilling hole 3
      C270.0 M31 ;      Drilling hole 4
      G80 M05 ;   Canceling the drilling cycle and stopping drill rotation
      M50 ;                  Setting C–axis index mode off




Notes:-
                   If the depth of cut for each cutting feed (Q) is not commanded, normal drilling is performed.(see the description of the drilling cycle.)
 
Support : Creating Website | Johny Template | Mas Template
Copyright © 2011. Online Education - All Rights Reserved
Template Created by Creating Website Published by Mas Template
Proudly powered by Blogger